W.175IEA’s 2035 data centre projection is about 1,500 TWh, Eco-Business reports; April’s had 1,193

The International Energy Agency’s World Energy Outlook 2026, published November 19, projects data centre electricity use of about 1,000 TWh in 2030 and about 1,500 TWh in 2035, by Eco-Business’s account of the report. The IEA’s April report had 945 and 1,193 TWh in its base case, so the reported 2035 figure is roughly a quarter higher. On the reported figures data centres are about a tenth of the growth in world electricity demand to 2035. We could not read the report itself; every 2026 Outlook figure here is second-hand.

Data centre electricity, 2035, as reported
~1,500 TWh
1,193 in the April base case; about 26% higher, 22% to 30% with rounding
Data centre electricity, 2030, as reported
~1,000 TWh
945 in April; the difference may be rounding
Share of world demand growth, 2025–35
~10%
about 1,000 of 10,466 TWh; our arithmetic
Cumulative data centre investment to 2030
~$4T
after $565B in 2025 alone, per Bloomberg’s account

What moved

The Outlook is the IEA’s annual flagship, and data centres are one thread of it. This year’s edition leads on the disruption to oil and gas shipments through the Strait of Hormuz, by the IEA’s press release. Bloomberg’s account and CNBC’s headline led with data centres and grids. The figures below come from those accounts and from Eco-Business and the Guardian, because the IEA’s pages for the report did not open for us; a republished copy of its press release carries no data centre figures.

The 2035 figure is where the reported numbers differ most. Only Eco-Business, of the accounts we read, gives totals in terawatt-hours: data centre demand of about 500 TWh today, 1,000 TWh by 2030 and 1,500 TWh by 2035 in the Outlook’s main scenario. The IEA’s April 2026 report, Key Questions on Energy and AI, had 485, 945 and 1,193 TWh in its Base Case. The 2030 figures differ by 55 TWh, or 6%, which rounding could explain. The 2035 figures differ by 307 TWh, or 26%; if “1,500” stands for anything from 1,450 to 1,549, the gap is 22% to 30%.

The difference is in the growth after 2030. In April the Base Case added 248 TWh between 2030 and 2035. The reported Outlook figures add about 500. Over the decade the Outlook has data centre use rising 3.0 times; April’s Base Case had 2.5 times.

The scenarios are not the same. April’s Base Case was built for that report; the Outlook’s figures are described as its main scenario, which a CNBC excerpt names as the Stated Policies Scenario. The comparison is between the April Base Case and what Eco-Business calls the Outlook’s main scenario, covering policies in place and formally proposed, seven months apart; it is not between identical models. The April report called its own 2035 figures exploratory, and the IEA’s press release describes all the Outlook’s scenarios that way.

The earlier editions had barely moved. The IEA’s first special report on energy and AI, in April 2025, put the Base Case at about 945 TWh in 2030 and about 1,200 in 2035. A year later the figures were 945 and 1,193.

The 2035 projection is about 1,500 TWh, against 1,193 in April

Global data centre electricity consumption in terawatt-hours. Grey: the Base Case of the IEA’s Key Questions on Energy and AI, April 2026 (Table A.1). Dashed pink and pink: the World Energy Outlook 2026 main scenario as reported by Eco-Business on November 19, in round numbers (“about 500” today, which we place at 2025, then 1,000 and 1,500); pink marks 2035. The Outlook figures are second-hand and the two scenarios are not identical.

04008001,2001,6002025: 485 TWh, Base Case, Key Questions on Energy and AI (April 2026)4852025: about 500 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~50020252030: 945 TWh, Base Case, Key Questions on Energy and AI (April 2026)9452030: about 1,000 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~1,00020302035: 1,193 TWh, Base Case, Key Questions on Energy and AI (April 2026)1,1932035: about 1,500 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~1,5002035
04008001,2001,6002025: 485 TWh, Base Case, Key Questions on Energy and AI (April 2026)4852025: about 500 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~50020252030: 945 TWh, Base Case, Key Questions on Energy and AI (April 2026)9452030: about 1,000 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~1,00020302035: 1,193 TWh, Base Case, Key Questions on Energy and AI (April 2026)1,1932035: about 1,500 TWh, World Energy Outlook 2026 main scenario, as reported by Eco-Business~1,5002035
IEA projections by edition, TWh
EditionScenario2024202520302035
Energy and AI, April 2025Base Case~415—~945~1,200
Key Questions, April 2026Base Case4164859451,193
World Energy Outlook 2026, as reportedMain scenario—~500~1,000~1,500

The reported figure sits 137 TWh below April’s Lift-Off case

Global data centre electricity consumption in 2035, in terawatt-hours. Black: the April 2026 Base Case. Grey: that report’s three sensitivity cases (Headwinds, High Efficiency, Lift-Off). Pink: the World Energy Outlook 2026 main scenario, about 1,500 TWh, as reported. From Table A.1 of Key Questions on Energy and AI and Eco-Business’s account of the Outlook.

03006009001,2001,5001,800HeadwindsApril 2026 reportHeadwinds, 2035: 942 TWh (2030: 833 TWh)942High EfficiencyApril 2026 reportHigh Efficiency, 2035: 1,013 TWh (2030: 868 TWh)1,013Base CaseApril 2026 reportBase Case, 2035: 1,193 TWh (2030: 945 TWh)1,193World Energy Outlook 2026main scenario, as reported; aboutWorld Energy Outlook 2026, 2035: about 1,500 TWh, as reported by Eco-Business~1,500Lift-OffApril 2026 reportLift-Off, 2035: 1,637 TWh (2030: 1,008 TWh)1,637
06001,2001,800HeadwindsApril 2026Headwinds, 2035: 942 TWh (2030: 833 TWh)942High EfficiencyApril 2026High Efficiency, 2035: 1,013 TWh (2030: 868 TWh)1,013Base CaseApril 2026Base Case, 2035: 1,193 TWh (2030: 945 TWh)1,193Outlook 2026as reportedWorld Energy Outlook 2026, 2035: about 1,500 TWh, as reported by Eco-Business~1,500Lift-OffApril 2026Lift-Off, 2035: 1,637 TWh (2030: 1,008 TWh)1,637
April 2026 cases and regions, TWh
Case20302035
Headwinds833942
High Efficiency8681,013
Base Case9451,193
Lift-Off1,0081,637
Base Case by region20252030
World485945
United States224426
China117277
Europe72114

Against world demand

World electricity demand rises about 37% in the decade. Eco-Business reports 28,576 TWh in 2025 and 39,042 TWh in 2035 in the main scenario, a rise of 10,466 TWh. The 2035 figure is 1,300 TWh above last year’s Outlook, which implies 37,742 TWh then; the 2025 edition’s text says about 37,800.

Data centres are about a tenth of that rise. From about 500 to about 1,500 TWh is about 1,000 TWh, 9.6% of the 10,466. Both inputs are round numbers, so the share is approximate. Their share of world demand goes from 1.75% to 3.8% on the same figures; the reported share today is about 1.7%.

Cooling adds more. Cooling and appliances add 2,900 TWh by 2035 and air conditioning alone 1,700 TWh, by the same account. It says the Outlook has data centres adding less than electric vehicles or battery and solar factories by 2035.

The load is concentrated. China, the European Union and the United States hold more than 80% of data centre demand in 2035, Eco-Business reports. In the United States, GreentechLead reports data centres going from about 200 TWh in 2025 to more than 830 TWh in 2035, more than 4 times; it names the Current Policies Scenario for total US demand but not for this figure, so it may not match the global one. April’s report put the US at 224 TWh in 2025.

Data centres add about 1,000 of the 10,466 TWh of demand growth to 2035

Growth in world electricity demand from 2025 to 2035 in the World Energy Outlook 2026 main scenario, in terawatt-hours, as reported by Eco-Business. Black: the total. Strong grey and grey: cooling and appliances, with air conditioning in strong grey. Pink: data centres, about 1,500 less about 500. Faint grey: the remainder, which is our subtraction and includes electric vehicles and industry. The bars are parts of the total, not a ranking of all uses.

03,0006,0009,00012,000Growth in world demand, 2025 to 203528,576 to 39,042 TWh39,042 − 28,576 = 10,466 TWh10,466Cooling and appliancesof which air conditioning 1,700 TWhAir conditioning: 1,700 TWhOther cooling and appliances, our subtraction: 1,200 TWh2,900Data centresabout; 10% of the growth, our arithmeticAbout 1,500 − about 500 = about 1,000 TWh~1,000Everything elseour remainder; includes electric vehicles and industry10,466 − 2,900 − 1,000 = 6,566 TWh~6,566
06,00012,000All demand growth28,576 to 39,04239,042 − 28,576 = 10,466 TWh10,466Cooling, appliancesair con 1,700Air conditioning: 1,700 TWhOther cooling and appliances, our subtraction: 1,200 TWh2,900Data centres10% of growthAbout 1,500 − about 500 = about 1,000 TWh~1,000Everything elseremainder10,466 − 2,900 − 1,000 = 6,566 TWh~6,566

Capacity, fuel and money

Capacity is expected to double by 2030. The Guardian’s account gives existing data centre capacity of 120 GW, about 80% of it in China, the US and the EU, and a further 120 GW by the end of the decade in the central scenario, three-quarters of it for AI.

The IEA tracked 93 AI sites by satellite. Bloomberg reports a tenfold rise in capacity at them in two years, and both accounts give about 50 GW when they are complete. The Guardian says capacity rose tenfold in 24 months to 17 GW; it words that as global capacity, but since it also gives 120 GW for all data centres we read the 17 GW as the tracked sites. That reading is ours. Bloomberg compares 50 GW to Great Britain’s peak demand. It also reports that planned data centres in some growth markets, if all were built, would exceed those markets’ current peak demand; it does not name them.

Gas serves most of the US load. Gas supplies about 60% of US data centre electricity in 2030, the Guardian reports, and plans as of August 2026 included about 180 GW of new gas-fired capacity linked to US data centres, against 11 GW in Canada and 4 GW in the rest of the world. In China about half the electricity for AI data centres comes from coal in 2030; in the EU about 70% of data centre electricity comes from renewables. Emissions from data centres rise 70% by 2030.

About $4 trillion goes into data centres by 2030. Bloomberg reports that sum after $565 billion of investment in 2025; it does not state the period, so the match with April’s $3.9 trillion for 2026 to 2030 is approximate. Last year’s Outlook expected $580 billion in 2025.

Grids. Eco-Business reports a need for at least 25 million km of new power lines over ten years and 15 million km to replace or upgrade. We found no figures from this Outlook for connection queues or equipment lead times.

120 GW of data centres today, a further 120 GW by 2030; 180 GW of US gas plans

Gigawatts, as reported from the World Energy Outlook 2026 by the Guardian and Bloomberg. Black: existing global data centre capacity. Dashed pink: capacity still to be built, in the central scenario to 2030 and at the 93 tracked AI sites. Pink: capacity at the tracked sites now, 17 GW on our reading of the Guardian’s account. Grey: new gas-fired generating capacity planned for US data centres as of August 2026, which is power plant capacity, not data centre capacity.

050 GW100 GW150 GW200 GW250 GWData centre capacity by 2030existing, plus additions in the central scenarioExisting global data centre capacity: 120 GWTo be built by the end of the decade, central scenario: a further 120 GW, three-quarters of it AI240 GWExisting data centre capacityworld; about 80% in China, the US and the EUExisting global data centre capacity: 120 GW120 GWThe 93 tracked AI sites, when complete17 GW now, on our reading of the GuardianCapacity at the 93 tracked sites now, on our reading of the Guardian's account: 17 GWStill to be completed, our subtraction: about 33 GW~50 GWGas plants planned for US data centresnew gas-fired capacity, as of August 2026; aboutNew gas-fired capacity linked to US data centres, plans as of August 2026: about 180 GW~180 GW
0100 GW200 GWCapacity, 2030120 now + 120Existing global data centre capacity: 120 GWTo be built by the end of the decade, central scenario: a further 120 GW, three-quarters of it AI240 GWCapacity todayworldExisting global data centre capacity: 120 GW120 GW93 AI sites, built17 GW now, our readingCapacity at the 93 tracked sites now, on our reading of the Guardian's account: 17 GWStill to be completed, our subtraction: about 33 GW~50 GWUS gas plansAugust 2026New gas-fired capacity linked to US data centres, plans as of August 2026: about 180 GW~180 GW

What this changes on inthesingularity.ai

  • Will AI compute run short or long through 2030? Lead: the IEA’s central case now adds 120 GW of data centre capacity by 2030, three-quarters for AI, by the Guardian’s account. That is a public-agency figure to set beside the pack’s supply path once the report’s tables can be read.
  • W.094 reported Bernstein rating 199 GW of North American plans credible. Lead: the IEA’s 93 tracked AI sites, at 17 GW now on our reading and about 50 GW when complete, give a second count, worldwide and by satellite.
  • What does a blue Texas mean for the data center boom? Lead: about 180 GW of gas plants planned for US data centres as of August 2026, with gas at about 60% of their supply in 2030.
  • Lead: redo this post from the Outlook’s own tables. The 2030 and 2035 figures here are round numbers from press accounts, and the exact values decide whether 2030 moved at all.

Sources and method

ItemFigureSource
Outlook 2026, as reportedData centre demand of about 500 TWh today, 1,000 TWh by 2030 and 1,500 TWh by 2035; about 1.7% of global electricity demand; world demand of 28,576 TWh in 2025 and 39,042 TWh in 2035 in the main scenario, 1,300 TWh above the previous outlook; cooling and appliances adding 2,900 TWh and air conditioning 1,700 TWh by 2035; data centres adding less than electric vehicles or battery and solar factories; coal and gas supplying about 60% of data centre electricity today; at least 25 million km of new power lines and 15 million km to replace or upgradeEco-Business, Nov 19
Outlook 2026, as reportedData centre investment of $565 billion in 2025 and $4 trillion by 2030; three-quarters of the growth for AI; 93 AI data centres tracked by satellite, with a tenfold rise in capacity in two years; fewer than 100 projects needing 50 GW; emissions up 70% by 2030Bloomberg, republished by Energy Connects, Nov 19
Outlook 2026, as reportedExisting capacity of 120 GW and a further 120 GW by the end of the decade; 17 GW at the tracked sites and about 50 GW when complete; an additional 350 TWh a year from AI data centres; about 180 GW of gas plants planned for US data centres as of August 2026, 11 GW in Canada and 4 GW elsewhere; the fuel shares for the US, China and the EU in 2030The Guardian, republished by the Irish Examiner, Nov 19
Outlook 2026, as reportedUS data centre consumption of about 200 TWh in 2025 and more than 830 TWh by 2035; no scenario is attached to the figureGreentechLead, Nov 19
Outlook 2026, as reportedAbout 1,000 TWh by 2030 in the Stated Policies Scenario, worded as “could”; about 26 million km of new lines and 16 million km to upgradeExcerpt of CNBC’s story on an aggregator, Nov 19
Outlook 2026The Outlook leads on the Strait of Hormuz supply shock and describes its scenarios as exploratory; no data centre figuresIEA press release, in a republished copy, Nov 19
Outlook 2026The report page, which we could not openIEA, World Energy Outlook 2026
April 2026 reportGlobal data centre electricity consumption of 360 TWh (2023), 416 (2024), 485 (2025), 945 (2030) and 1,193 (2035) in the Base Case; the Lift-Off, High Efficiency and Headwinds cases (Table A.1); the regional split (Table A.4); cumulative investment of $3.9 trillion from 2026 to 2030IEA, Key Questions on Energy and AI, April 2026
April 2025 reportAbout 415 TWh in 2024, about 945 TWh in 2030 and about 1,200 TWh in 2035 in the Base CaseIEA, Energy and AI, April 2025
Outlook 2025Data centre electricity use doubling by 2030 and set to triple by 2035; world demand of about 37,800 TWh in 2035IEA, World Energy Outlook 2025, November 2025

What we read. Press accounts of the World Energy Outlook 2026 published on November 19 (Bloomberg and the Guardian in republished copies, Eco-Business, GreentechLead), and the IEA’s own earlier reports: Key Questions on Energy and AI (April 2026), Energy and AI (April 2025) and the World Energy Outlook 2025. The IEA’s report page, executive summary and press release for the 2026 Outlook did not open; we read the press release in a republished copy and found no copy of the report. Arithmetic. Revisions: 1,000 − 945 = 55; ÷ 945 = 5.8%; 1,500 − 1,193 = 307; ÷ 1,193 = 25.7%. Growth after 2030: 1,193 − 945 = 248; 1,500 − 1,000 = 500. Rounding range: 1,450 ÷ 1,193 − 1 = 21.5%; 1,549 ÷ 1,193 − 1 = 29.8%. Multiples: 1,500 ÷ 500 = 3.0; 1,193 ÷ 485 = 2.46. Lift-Off: 1,637 − 1,500 = 137. World demand: 39,042 − 28,576 = 10,466; ÷ 28,576 = 36.6%; 39,042 − 1,300 = 37,742. Data centres: 1,500 − 500 = 1,000; ÷ 10,466 = 9.6%; 500 ÷ 28,576 = 1.75%; 1,500 ÷ 39,042 = 3.84%. Remainder: 10,466 − 2,900 − 1,000 = 6,566. Capacity: 120 + 120 = 240; 50 − 17 = 33. United States: 830 ÷ 200 = 4.15. Conflicts between sources. Eco-Business gives at least 25 million km of new lines and 15 million km to upgrade; a CNBC excerpt gives about 26 and 16 million km. Bloomberg’s wording has data centre capacity rising tenfold in two years at the tracked sites; the Guardian’s has global capacity rising tenfold to 17 GW, which we read as the tracked sites’ figure, since it gives 120 GW for all data centres. Investment in 2025 is $565 billion in this Outlook by Bloomberg’s account and was $580 billion, as an expectation, in last year’s. US consumption in 2025 is about 200 TWh in one account of the Outlook and 224 TWh in April’s report. Accounts differ on the verb: “will” in Eco-Business and the Guardian, “could” in the CNBC excerpt. Limits. Every World Energy Outlook 2026 figure is taken from press accounts and is a round number; we have not checked scenario names, years or wording against the IEA’s text, and the accounts’ “main”, “central” and Stated Policies scenarios may not all be the same one. Only Eco-Business gives the 2035 total. We could not open CNBC’s article and cite an excerpt of it. The share of demand growth and the remainder are our arithmetic on rounded inputs. The April Base Case and the Outlook’s main scenario are different scenarios. The Outlook 2025’s data centre figures in terawatt-hours are in a chart we could not read; its text says use doubles by 2030 and triples by 2035.

Wire reports are written within hours of the news, on a six-hour schedule. Each lists its sources and shows the arithmetic behind its figures. Not investment advice.