031How long can the AI supply chain keep selling on credit?
Sixty-two listed companies in the AI supply chain were owed $757B at their latest quarter-ends, 68% more than a year earlier, while their revenue rose 50%. About five-sixths of the increase is growth collected at last year’s pace. The rest is slower collection, and most of what is true customer credit sits at Nvidia, which now gives investment-grade buyers 90 days to a year to pay. Five customers held 70% of what Nvidia was owed in July, and the credit shows up as unpaid bills at the assemblers that build their systems. At this year’s slope the suppliers’ collection time passes 60 days in three to five quarters.
What is owed
The chain is owed $757B. We added up the receivables of 62 listed companies, from foundries to cloud software, at each quarter-end since 2022. The total was $316B at the end of 2022 and $451B a year ago. $307B of the increase came in the last four quarters.
The suppliers hold most of it and all of the acceleration. The 49 companies that sell into the build-out, from chip designers to neoclouds, are owed $475B, up 97% in a year on revenue up 84%. The five hyperscalers are owed $267B and eight AI software companies $15B. Most of what those two groups are owed comes from businesses other than AI, so they are shown apart.
The total is gross. One server order creates a receivable at the assembler, at Nvidia, at the memory maker and at the foundry, and all four are counted here. Customer prepayments, which run the other way, are not netted off.
Receivables rose from $316B to $757B in fifteen quarters
$ billions at quarter-end, by calendar quarter. Pink: the 49 suppliers. Strong grey: five hyperscalers. Grey: eight AI software companies. The latest quarter holds nine companies that have not yet reported their October quarters at their previous balances, $54B in all: Broadcom, Marvell, Ciena, Credo, Dell, HPE, Snowflake, Salesforce, MongoDB.
Every quarter: the whole chain and the suppliers
| Quarter | All 62, $B | Revenue, $B | ÷ quarter revenue | ÷ 12-month revenue | On a year | Suppliers, $B | ÷ quarter revenue | Days | ÷ 12-month revenue | On a year | Revenue on a year |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Q4 2022 | 316.1 | 620 | 51.0% | 13.7% | 161.6 | 57.6% | 52.5 | 14.9% | |||
| Q1 2023 | 272.1 | 550 | 49.4% | 11.8% | −4% | 134.8 | 55.7% | 50.8 | 12.7% | −16% | −8% |
| Q2 2023 | 301.4 | 577 | 52.2% | 13.0% | −1% | 144.8 | 58.3% | 53.2 | 13.9% | −12% | −8% |
| Q3 2023 | 303.3 | 607 | 50.0% | 12.9% | +1% | 152.8 | 57.6% | 52.5 | 14.7% | −12% | −3% |
| Q4 2023 | 340.4 | 687 | 49.5% | 14.1% | +8% | 156.3 | 52.8% | 48.2 | 14.9% | −3% | +6% |
| Q1 2024 | 317.6 | 625 | 50.8% | 12.7% | +17% | 151.2 | 56.1% | 51.2 | 14.0% | +12% | +11% |
| Q2 2024 | 356.9 | 671 | 53.2% | 13.8% | +18% | 169.7 | 56.6% | 51.6 | 15.0% | +17% | +21% |
| Q3 2024 | 373.7 | 724 | 51.6% | 13.8% | +23% | 195.9 | 58.2% | 53.1 | 16.3% | +28% | +27% |
| Q4 2024 | 399.4 | 796 | 50.1% | 14.2% | +17% | 199.1 | 55.6% | 50.8 | 15.8% | +27% | +21% |
| Q1 2025 | 385.1 | 735 | 52.4% | 13.2% | +21% | 195.6 | 57.5% | 52.5 | 14.6% | +29% | +26% |
| Q2 2025 | 442.2 | 825 | 53.6% | 14.4% | +24% | 223.0 | 56.0% | 51.1 | 15.6% | +31% | +33% |
| Q3 2025 | 450.6 | 874 | 51.6% | 13.9% | +21% | 240.8 | 56.9% | 51.9 | 15.9% | +23% | +26% |
| Q4 2025 | 512.1 | 1,002 | 51.1% | 14.9% | +28% | 272.4 | 55.4% | 50.5 | 16.5% | +37% | +37% |
| Q1 2026 | 560.9 | 1,015 | 55.2% | 15.1% | +46% | 321.8 | 59.5% | 54.3 | 17.4% | +65% | +59% |
| Q2 2026 | 676.9 | 1,169 | 57.9% | 16.7% | +53% | 392.2 | 60.2% | 55.0 | 18.6% | +76% | +64% |
| Q3 2026 | 757.2 | 1,314 | 57.6% | 16.8% | +68% | 475.0 | 61.0% | 55.6 | 19.3% | +97% | +84% |
Measured against revenue
Receivables have outgrown revenue for three quarters. The suppliers’ receivables sat between 53% and 58% of a quarter’s revenue from the end of 2022 through 2025. They were 59.5% in March, 60.2% in June and 61.0% now. That is 55.6 days of sales, against 51.9 a year ago.
Against trailing revenue the rise looks larger than it is. Suppliers’ receivables are 19.3% of their revenue over the last twelve months, up from 15.9%. Part of that is arithmetic. While revenue is doubling, the last twelve months understate the current quarter, so this ratio rises even when nobody pays a day later. The quarterly ratio is the cleaner read.
The hyperscalers’ ratio peaks every June. Microsoft bills heavily at its fiscal year-end. AI software swings further, between about 45% and 95% of a quarter’s revenue, because annual contracts are billed around the year-end, and it is left off the two charts.
Against the quarter’s revenue, suppliers left their old range in 2026
Receivables as a percent of the same quarter’s revenue. Pink: suppliers. Black: all 62. Strong grey: hyperscalers. 61.0% of a quarter’s revenue is 55.6 days of sales.
Against twelve months of revenue: 19.3% for suppliers, from 15.9%
Receivables as a percent of revenue over the trailing four quarters. Pink: suppliers. Black: all 62. Strong grey: hyperscalers.
Is the rise accelerating?
In dollars and in growth rate, yes. Supplier receivables were growing 23% a year four quarters ago and are growing 97% now. The amount added in a quarter went from $18B to $83B. Growth in receivables matched growth in revenue at the end of 2025 and has run ahead of it in each quarter since, by 13 points in the latest.
In days, it accelerated through June and then paused. The 43 suppliers that have reported the latest quarter grew receivables 24% in three months on revenue up 23%. Their collection time went from 56.6 days to 57.0, because memory makers collected faster while Nvidia collected slower.
Supplier receivables are growing 97% a year, 13 points faster than revenue
The 49 suppliers, change on the same quarter a year earlier, percent. Pink: receivables. Black: revenue.
Suppliers added $83B of receivables in the latest quarter, against $18B a year earlier
Change in the suppliers’ receivables in each quarter, $ billions. Pink: a rise. Strong grey: a fall.
Who added it
Four layers added 85% of the dollars. Over each company’s own last four quarters the chain added $304B: hyperscalers $69.9B, memory and storage $65.1B, servers and assemblers $63.3B and chip designers $59.7B.
Most of that is growth. We split each company’s change in two. Growth is what its receivables would have added if it still collected at last year’s pace. Slower collection is the rest. Growth accounts for $253.2B, or 83%. Memory makers and assemblers show what that looks like: together they added $128B and their days did not move.
Slower collection is $50.7B, and most of it is not credit to customers. Amazon accounts for $29.7B, and the larger part of its increase this year is money owed by its own vendors: its vendor receivables rose from $15.9B to $28.8B in nine months, while customer receivables rose from $40.4B to $52.6B. Nebius accounts for $3.4B, and that is the opposite of credit: it invoices customer prepayments, which sit in receivables against deferred revenue. In the third quarter its receivables rose $3.8B and its deferred revenue $3.4B (W.096).
What is left is $17.6B, and Nvidia is $13.2B of it. No other company adds more than about $2B: GE Vernova $2.2B, Broadcom $1.7B, Wistron $1.6B. So the question of who is being given more time to pay is mostly a question about Nvidia’s customers.
Four layers added 85% of the dollars; slower collection sits with hyperscalers and chip designers
Receivables added over each company’s own last four quarters, $ billions, by layer. Strong grey: from revenue growth. Pink: from slower collection. Faint grey: growth that faster collection offset, so the bar’s solid part ends at the layer’s actual increase. The total, $304B, differs slightly from the $307B measured on calendar quarters.
Days rose most where prepayments are invoiced and where Nvidia sits
Days sales outstanding by layer: receivables ÷ the quarter’s revenue × 91.25. Open dot: a year ago. Pink dot: now, with the change in brackets. Neoclouds’ 115 days are inflated by the prepayments Nebius and CoreWeave invoice.
Every layer
| Layer | Companies | Receivables, $B | A year ago | Change | From growth | From slower collection | Days | A year ago | Revenue on a year |
|---|---|---|---|---|---|---|---|---|---|
| Chip designers | 7 | 111.8 | 52.1 | +59.7 | +44.4 | +15.3 | 56 | 48 | +81% |
| Memory and storage | 5 | 86.1 | 21.0 | +65.1 | +68.0 | −3.0 | 52 | 52 | +314% |
| Foundry and chip equipment | 6 | 46.1 | 29.3 | +16.8 | +14.3 | +2.5 | 50 | 47 | +47% |
| Networking and optics | 11 | 24.8 | 16.9 | +7.9 | +7.7 | +0.2 | 50 | 48 | +40% |
| Servers and assemblers | 9 | 161.7 | 98.5 | +63.3 | +64.1 | −0.8 | 55 | 55 | +64% |
| Power and cooling | 6 | 34.7 | 23.1 | +11.6 | +9.7 | +2.0 | 79 | 74 | +41% |
| Neoclouds and data centers | 5 | 9.8 | 2.9 | +6.9 | +3.5 | +3.4 | 115 | 65 | +88% |
| Hyperscalers | 5 | 267.2 | 197.4 | +69.9 | +38.6 | +31.3 | 48 | 42 | +19% |
| AI software | 8 | 15.0 | 12.1 | +2.8 | +2.8 | 0.0 | 47 | 46 | +20% |
| All 62 | 62 | 757.2 | 453.3 | +303.9 | +253.2 | +50.7 |
The twelve largest increases
Each company’s latest fiscal quarter against the same quarter a year earlier, $ billions. Amazon’s line includes vendor and other receivables.
| Company | Receivables, $B | Change in a year | From growth | From slower collection | Days | A year ago |
|---|---|---|---|---|---|---|
| Nvidia | 81.0 | +47.6 | +34.5 | +13.2 | 64 | 53 |
| Amazon | 98.2 | +37.1 | +7.4 | +29.7 | 45 | 31 |
| SK hynix | 43.6 | +33.4 | +35.0 | −1.5 | 52 | 54 |
| Micron | 31.8 | +24.6 | +27.2 | −2.5 | 57 | 58 |
| Hon Hai | 57.1 | +16.1 | +16.4 | −0.4 | 56 | 56 |
| Alphabet | 72.8 | +15.6 | +14.1 | +1.5 | 52 | 51 |
| Quanta Computer | 29.2 | +15.1 | +16.3 | −1.1 | 77 | 80 |
| Wistron | 20.6 | +10.8 | +9.2 | +1.6 | 52 | 48 |
| Microsoft | 62.1 | +9.2 | +9.9 | −0.8 | 62 | 63 |
| Dell | 22.9 | +7.9 | +8.7 | −0.8 | 44 | 46 |
| Broadcom | 13.7 | +7.2 | +5.6 | +1.7 | 42 | 37 |
| Supermicro | 9.7 | +7.2 | +7.5 | −0.4 | 45 | 46 |
Who gets the credit
Nvidia says who qualifies. Its filings say payment is normally due shortly after delivery, and that for purchases by investment-grade customers it now gives 90 days to a year, to help with large data center builds. Neoclouds and labs, many of which it says are growing faster than their balance sheets and credit profiles can support, get a different kind of help: guarantees, with a maximum of $118B at October 25, $105B of it backing a campus in Ohio that is leased to OpenAI for 20 years (W.155). Guarantees are not receivables and are not in the $757B.
It is a handful of accounts. Five direct customers held 70% of Nvidia’s receivables in July, $44B in balances of $6B to $14B each. In January three held 56%. Only one of the five was above 10% of that quarter’s revenue, at 16%, so together they were under 56% of sales. That works out to at least 75 days for the five and at most 41 for everyone else, which is Nvidia’s old pace. Shipments bunched late in a quarter can produce the same picture, and Nvidia says its Rubin launch did some of that in October. It also says the extended terms are a cause.
The credit shows up at the assemblers. A longer receivable at a seller is a longer payable at a buyer, so we measured days payable at eight companies that build AI systems: what they owe suppliers against what they bought in the quarter. Days rose 26 at Quanta, 21 at Jabil, 20 at Celestica, 14 at Flex and 9 at Wistron. They were flat at Hon Hai and Dell and fell at Supermicro. Quanta’s went 71, 85, 102 across the same three quarters in which Nvidia’s collection days went 45, 60, 64.
About $19B of what they owe is longer terms. The five where days rose owe suppliers $90B, against $39B a year ago. Most of that increase is volume. About $19B is the extra days. That is the same order of size as the $13.2B of slower collection at Nvidia, though payables are owed to every supplier and not to Nvidia alone.
Hyperscalers moved less. Capital spending not yet paid for is 64 days of quarterly capital spending at Alphabet, against 55 a year ago, and 57 at Meta, against 44. At Oracle it fell from 43 days to 20. Microsoft’s payables grew 31% while its capital spending grew 103%.
One way the two fit together is visible at Dell. Nvidia says investment-grade, and the payables are at assemblers. Dell’s filing for the quarter to July 31 discloses guarantees to a supplier for components that its contract manufacturers buy, up to $8.6B. The disclosure is not in its two previous filings. Under a structure like that, the purchase is an investment-grade company’s and the unpaid bill is the assembler’s. Neither filing names the other party.
Days payable rose 9 to 26 days at five system builders, and fell at Supermicro
Days payable: accounts payable ÷ (cost of revenue + the change in inventory) × 91, so that building inventory does not read as longer terms. Open dot: a year ago. Pink dot: the latest quarter, with the change in brackets. Quarters ended July 31 (Dell), August 31 (Jabil) and September (the rest).
Payables and both measures of days
| Company | Quarter to | Payables, $B | A year ago | Payables on a year | Purchases on a year | Days payable | A year ago | Change | On cost of revenue alone | A year ago |
|---|---|---|---|---|---|---|---|---|---|---|
| Quanta Computer | Sep 30 | 39.7 | 13.9 | +199% | +121% | 102.0 | 75.6 | +26.4 | 108.3 | 83.5 |
| Jabil | Aug 31 | 14.4 | 7.9 | +82% | +50% | 118.5 | 97.9 | +20.6 | 136.7 | 96.7 |
| Celestica | Sep 30 | 5.0 | 1.7 | +200% | +117% | 72.8 | 52.6 | +20.3 | 88.4 | 55.0 |
| Flex | Sep 25 | 9.7 | 6.1 | +58% | +37% | 103.5 | 89.3 | +14.2 | 115.3 | 90.2 |
| Wistron | Sep 30 | 20.7 | 9.1 | +138% | +97% | 50.4 | 41.8 | +8.6 | 55.5 | 47.9 |
| Hon Hai | Sep 30 | 60.3 | 45.3 | +39% | +36% | 58.9 | 57.7 | +1.2 | 61.8 | 65.2 |
| Dell | Jul 31 | 49.7 | 27.5 | +81% | +80% | 104.3 | 103.6 | +0.7 | 121.8 | 102.7 |
| Supermicro | Sep 30 | 2.7 | 1.3 | +113% | +249% | 12.7 | 20.8 | −8.1 | 14.3 | 25.6 |
How the other buyers pay
Buyers outside those terms pay early, pay interest or lean on a guarantee. None of it lengthens the receivables added up here.
Four other ways the hardware gets paid for
| Buyer | How it pays | Data point |
|---|---|---|
| Supermicro | Early | It pays suppliers in about 13 days, against 21 a year ago, and had paid $776M in advance for inventory at September 30. Its payables were $2.2B at June 30, less than the smallest of the five balances at Nvidia. |
| CoreWeave | With interest | It lists financing from equipment makers among the ways it funds capital spending, at a weighted-average rate of 9% on the short-term part. |
| Dell’s customers | On loans and leases | Dell’s financing receivables rose from $12.0B to $20.4B in a year. It originated $7.5B in the quarter to July 31, against $2.4B a year earlier. These are a separate line from trade receivables. |
| Neoclouds and labs | Against Nvidia’s guarantee | A maximum of $118B of guarantees at October 25, and $32B of agreements with neoclouds that take effect only if they secure financing. |
Trade collection days at Dell and Supermicro are slightly shorter than a year ago (−1.5 and −1.6 days), so their customers are not being given longer open-account terms either.
Is it sustainable, and for how long?
The level is sustainable. The slope is not. 83% of the increase scales with revenue and unwinds when revenue does, and Nvidia says its longer terms go to investment-grade buyers. What cannot continue is days rising every quarter. Three things in the data bear on how long it can.
Nvidia changed its terms. Its days sales outstanding went from 45 to 60 to 64 in two quarters, and it added $40B of receivables in six months, to $81.0B. The last time it was higher was October 2022, at 75 days, when its sales were falling. Pack 029 follows what that does to its cash.
The float is carried by thin-margin assemblers. Hon Hai, Quanta and Wistron are owed $107B, up from $65B a year ago, on gross margins of 5% to 6%. Their combined short-term debt rose from NT$818B at the end of 2024 to NT$1.75T at the end of September. Their collection days are flat, so their customers are still paying on time. This is the layer where a late payment would show first.
The payers are borrowing. In the third quarter capital spending exceeded cash from operations at Alphabet, Amazon and Meta (pack 021), and at Oracle. Goldman Sachs projects $296B of hyperscaler debt this year and $440B in 2027. Every receivable in the chain is in the end a claim on that financing.
At this year’s slope the count is three to five quarters. The suppliers’ 55.6 days have risen 0.9 a quarter over the last year and 1.7 a quarter in 2026. At those paces they pass 60, which is above anything in four years of data, in 2.6 to 4.7 quarters. Nvidia passes its 2022 high in 1.2 to 2.8 quarters and reaches 90 days in 2.9 to 6.6. The first real test is earlier: by July 2027 every invoice from Nvidia’s first quarter of extended terms will have come due.
Lucent is the reference case, and it differs in who was lent to. Lucent’s days went from 75 to 89 to 102 across fiscal 1998 to 2000, beside more than $7B of credit commitments to customers, before the write-offs. It lent to start-up carriers. The suppliers here have moved 4 days in a year and Nvidia 10, and the extended terms go to investment-grade buyers. The exposure to weaker credits is in the guarantees and the financing above, which the receivables total does not capture.
Suppliers can afford the float. Nvidia generated $48B of cash from operations in the October quarter even after its receivables rose $18B. The limit is on the other side: whether buyers can keep raising the money.
At the latest pace Nvidia passes its 2022 high in about three quarters
Nvidia’s days sales outstanding by fiscal quarter: receivables ÷ the quarter’s revenue × 91. Solid pink: reported. Dashed pink: the latest level carried forward at the latest quarter’s rise and at the average of the last two. The dashed lines are arithmetic, not a forecast.
| Measure | Now | Rise a quarter | Level | Quarters to reach it |
|---|---|---|---|---|
| Suppliers, days | 55.6 | 0.9 to 1.7 | 60 | 2.6 to 4.7 |
| Nvidia, days | 63.7 | 4.0 to 9.1 | 75 | 1.2 to 2.8 |
| Nvidia, days | 63.7 | 4.0 to 9.1 | 90 | 2.9 to 6.6 |
What would shorten it
- Days turning up at memory makers or assemblers, where they are flat today.
- Nvidia’s days still rising after July 2027, when its first extended-terms invoices have all come due.
- Nvidia’s receivables outgrowing its revenue while revenue growth slows. Its 75-day reading in October 2022 came with falling sales.
- The five-customer share in Nvidia’s next 10-Q. The filing for the October quarter is not out yet; July’s was 70%.
- A hyperscaler bond deal pulled or repriced, or a guarantee called.
The tier list
All 62 companies by receivables as a share of the latest quarter’s revenue. The level reflects the business as much as behaviour: equipment makers and contractors bill long, and software bills a year ahead. The arrows show who is moving. Nebius and CoreWeave top the list because they invoice prepayments, which is the opposite of extending credit. Nvidia is mid-table on level and one of the fastest movers among large companies.
All 62 companies
| Company | Layer | Quarter to | Receivables, $B | ÷ quarter revenue | Days | Change on a year | ÷ 12-month revenue | Receivables on a year | Revenue on a year |
|---|---|---|---|---|---|---|---|---|---|
| Running a bank 100% or more | |||||||||
| Nebius† NBIS | Neoclouds | Sep 30 | 4.0 | 412% | 379 | +322 | 184% | +4340% | +572% |
| Applied Opto AAOI | Networking | Sep 30 | 0.41 | 153% | 141 | −32 | 55% | +85% | +127% |
| CoreWeave† CRWV | Neoclouds | Sep 30 | 4.3 | 117% | 108 | −4 | 43% | +158% | +168% |
| Vertiv VRT | Power, cooling | Sep 30 | 4.4 | 102% | 93 | −3 | 33% | +56% | +61% |
| Check’s in the mail 80–99% | |||||||||
| GE Vernova† GEV | Power, cooling | Sep 30 | 11.6 | 92% | 84 | +16 | 26% | +57% | +27% |
| ASML ASML | Fabs, tools | Sep 27 | 12.1 | 89% | 81 | +4 | 26% | +61% | +54% |
| Applied Materials AMAT | Fabs, tools | Oct 25 | 9.0 | 86% | 79 | +9 | 26% | +74% | +53% |
| Teradyne TER | Fabs, tools | Sep 27 | 1.1 | 85% | 77 | +7 | 22% | +87% | +70% |
| Quanta Services PWR | Power, cooling | Sep 30 | 10.1 | 84% | 78 | +1 | 27% | +60% | +57% |
| IREN IREN | Neoclouds | Sep 30 | 0.19 | 84% | 77 | +68 | 28% | +700% | −5% |
| Quanta Computer 2382.TW | Assemblers | Sep 30 | 29.2 | 84% | 77 | −3 | 26% | +107% | +115% |
| Palantir PLTR | Software | Sep 30 | 1.9 | 81% | 75 | −3 | 26% | +87% | +96% |
| Marvell MRVL | Chips | Aug 1 | 2.2 | 81% | 74 | +8 | 23% | +53% | +37% |
| Modine MOD | Power, cooling | Sep 30 | 0.80 | 80% | 74 | +4 | 22% | +42% | +35% |
| Eaton ETN | Power, cooling | Sep 30 | 7.2 | 80% | 74 | 0 | 22% | +29% | +28% |
| Net-60 and vibes 65–79% | |||||||||
| Fabrinet FN | Networking | Sep 25 | 1.2 | 79% | 72 | +6 | 23% | +64% | +51% |
| Amphenol APH | Networking | Sep 30 | 7.8 | 76% | 70 | +2 | 24% | +71% | +65% |
| Arm ARM | Chips | Sep 30 | 1.1 | 75% | 69 | −21 | 20% | −3% | +27% |
| KLA KLAC | Fabs, tools | Sep 30 | 3.1 | 74% | 68 | +3 | 21% | +35% | +29% |
| Ciena CIEN | Networking | Aug 1 | 1.2 | 74% | 67 | −9 | 20% | +20% | +37% |
| Nvidia NVDA | Chips | Oct 25 | 81.0 | 70% | 64 | +10 | 22% | +143% | +103% |
| AMD AMD | Chips | Sep 26 | 9.2 | 69% | 63 | +2 | 20% | +49% | +45% |
| Lam Research LRCX | Fabs, tools | Sep 27 | 5.7 | 69% | 63 | +1 | 22% | +56% | +54% |
| Flex FLEX | Assemblers | Sep 25 | 5.8 | 68% | 62 | +10 | 19% | +50% | +25% |
| Coherent COHR | Networking | Sep 30 | 1.6 | 68% | 62 | +3 | 20% | +56% | +50% |
| Microsoft MSFT | Hyperscalers | Sep 30 | 62.1 | 67% | 62 | −1 | 18% | +17% | +19% |
| Datadog DDOG | Software | Sep 30 | 0.79 | 66% | 61 | +4 | 19% | +44% | +35% |
| Celestica† CLS | Assemblers | Sep 30 | 3.8 | 65% | 59 | −11 | 21% | +54% | +83% |
| Pays like an adult 50–64% | |||||||||
| Corning GLW | Networking | Sep 30 | 3.1 | 64% | 59 | +2 | 18% | +24% | +18% |
| Arista ANET | Networking | Sep 30 | 2.3 | 64% | 59 | −1 | 20% | +56% | +58% |
| Jabil JBL | Assemblers | Aug 31 | 6.5 | 61% | 56 | +11 | 18% | +61% | +29% |
| Cloudflare NET | Software | Sep 30 | 0.48 | 61% | 56 | −1 | 17% | +36% | +39% |
| Hon Hai 2317.TW | Assemblers | Sep 30 | 57.1 | 60% | 56 | 0 | 18% | +39% | +40% |
| Credo CRDO | Networking | Aug 1 | 0.29 | 60% | 55 | −19 | 18% | +60% | +115% |
| Sandisk SNDK | Memory | Oct 2 | 6.6 | 60% | 54 | +4 | 23% | +452% | +378% |
| MongoDB MDB | Software | Jul 31 | 0.46 | 59% | 55 | 0 | 16% | +31% | +31% |
| Oracle ORCL | Hyperscalers | Aug 31 | 11.4 | 59% | 54 | 0 | 16% | +29% | +30% |
| Micron MU | Memory | Sep 3 | 31.8 | 59% | 57 | 0 | 24% | +344% | +379% |
| Wistron 3231.TW | Assemblers | Sep 30 | 20.6 | 57% | 52 | +4 | 18% | +110% | +93% |
| Alphabet GOOGL | Hyperscalers | Sep 30 | 72.8 | 57% | 52 | +1 | 15% | +27% | +25% |
| SK hynix 000660.KS | Memory | Sep 30 | 43.6 | 57% | 52 | −2 | 23% | +328% | +343% |
| Salesforce CRM | Software | Jul 31 | 6.3 | 56% | 51 | +1 | 14% | +13% | +11% |
| ServiceNow NOW | Software | Sep 30 | 2.2 | 54% | 50 | +8 | 14% | +44% | +21% |
| Bloom Energy BE | Power, cooling | Sep 30 | 0.64 | 51% | 47 | −26 | 17% | +54% | +138% |
| Western Digital WDC | Memory | Oct 2 | 2.2 | 51% | 46 | −1 | 15% | +65% | +55% |
| HPE HPE | Assemblers | Jul 31 | 6.2 | 51% | 47 | −10 | 15% | +9% | +34% |
| Lumentum LITE | Networking | Sep 26 | 0.63 | 50% | 45 | −7 | 17% | +104% | +137% |
| Cash on the barrel under 50% | |||||||||
| Dell DELL | Assemblers | Jul 31 | 22.9 | 49% | 44 | −2 | 15% | +53% | +58% |
| Amazon† AMZN | Hyperscalers | Sep 30 | 98.2 | 49% | 45 | +14 | 12% | +61% | +12% |
| Supermicro SMCI | Assemblers | Sep 30 | 9.7 | 49% | 45 | −2 | 18% | +284% | +297% |
| Astera Labs ALAB | Networking | Sep 30 | 0.28 | 49% | 45 | +28 | 18% | +560% | +153% |
| Equinix EQIX | Neoclouds | Sep 30 | 1.2 | 47% | 43 | −2 | 12% | +5% | +11% |
| Snowflake SNOW | Software | Jul 31 | 0.72 | 46% | 43 | −9 | 13% | +11% | +35% |
| Broadcom AVGO | Chips | Aug 2 | 13.7 | 46% | 42 | +5 | 15% | +111% | +86% |
| Seagate STX | Memory | Oct 2 | 1.8 | 43% | 39 | −1 | 13% | +69% | +61% |
| Monolithic Power MPWR | Chips | Sep 30 | 0.46 | 38% | 35 | +5 | 12% | +91% | +63% |
| Meta META | Hyperscalers | Sep 30 | 22.7 | 35% | 32 | +1 | 9% | +31% | +26% |
| Applied Digital APLD | Neoclouds | Aug 31 | 0.11 | 33% | 31 | −2 | 13% | +293% | +322% |
| TSMC TSM | Fabs, tools | Sep 30 | 15.2 | 32% | 30 | +1 | 10% | +50% | +44% |
| Cisco CSCO | Networking | Oct 24 | 5.9 | 32% | 29 | 0 | 9% | +23% | +24% |
| Adobe ADBE | Software | Aug 28 | 2.1 | 31% | 28 | −4 | 8% | −1% | +13% |
| Intel INTC | Chips | Sep 26 | 4.1 | 25% | 23 | +1 | 7% | +28% | +21% |
What this is anchored on
| Item | Data point | Source |
|---|---|---|
| Receivables and revenue | Quarter-end receivables and quarterly revenue for 54 US filers, fiscal quarters ended March 2022 to September 2026; payables, cost of revenue, inventory, capital spending and capital spending not yet paid for the buyers in the payables section | SEC EDGAR, XBRL company facts (10-Q and 10-K) |
| Receivables and revenue | Quarterly statements for Hon Hai, Quanta, Wistron, TSMC, SK hynix, ASML, Lumentum and Nebius; payables, inventory, short-term debt and gross profit for the three Taiwan assemblers | stockanalysis.com |
| Nvidia | Quarter to October 25: receivables $81.0B, 64 days sales outstanding against 60, attributed to the timing of shipments from the Rubin launch and to extended payment terms on large multi-quarter agreements with certain investment-grade customers; cash from operations $48.3B; guarantees with a maximum gross exposure of $118B, $105B of it for SB Energy’s Ohio campus, leased to OpenAI for 20 years; $32B of neocloud agreements that take effect only if the neoclouds secure financing | Nvidia, CFO commentary, Nov 17 |
| Nvidia | Payment terms of 90 days up to one year for investment-grade customer purchases, to assist customers with large data center builds; five direct customers at 22%, 14%, 13%, 11% and 10% of receivables on July 26, three at 25%, 18% and 13% on January 25; one direct customer at 16% of the quarter’s revenue; who counts as a direct customer | Nvidia, 10-Q for the quarter to July 26 |
| Applied Materials | Quarter to October 25: receivables $8,998M, revenue $10,409M | Applied Materials, fourth-quarter release |
| Amazon | Customer receivables $52.6B and vendor receivables $28.8B at September 30, against $40.4B and $15.9B at December 31 | Amazon, 10-Q for the quarter to September 30 |
| Dell | Financing receivables $20.4B at July 31 ($14.3B at January 30); new financing originations $7.5B in the quarter against $2.4B a year earlier, attributed to demand for its infrastructure segment’s products; guarantees to a supplier for components bought by its contract manufacturers, up to $8.6B, which do not appear in its two previous filings | Dell, 10-Q for the quarter to July 31 |
| Supermicro | Prepayments to purchase inventory $776M at September 30 ($315M at June 30); payment terms it offers are generally 30 to 60 days | Super Micro Computer, 10-Q for the quarter to September 30 |
| CoreWeave | Capital spending funded by debt, equity, delayed-draw term loans, financing arrangements with equipment makers and cash; a weighted-average rate of 9% on the short-term debt under those arrangements | CoreWeave, 10-Q for the quarter to September 30 |
| Nebius | Third quarter: receivables up $3.8B, deferred revenue up $3.4B | Nebius, third-quarter release, Nov 12 |
| Hyperscalers | Third-quarter capital spending above cash from operations at Alphabet, Amazon and Meta (figures in pack 021) and at Oracle | Decoding Discontinuity |
| Hyperscalers | Goldman Sachs’ projection of hyperscaler debt supply: $296B in 2026 and $440B in 2027 | TradingKey, citing Goldman Sachs |
| Lucent | Average days sales outstanding of 75, 89, 102 in fiscal 1998, 1999 and 2000; more than $7B of credit commitments to customers | Lucent Technologies, 10-K405 for fiscal 2000 |
Method
The companies. 62 listed companies in nine layers: chip designers (7), memory and storage (5), foundry and chip equipment (6), networking and optics (11), servers and assemblers (9), power and cooling (6), neoclouds and data centers (5), hyperscalers (5), AI software (8). The first seven are the suppliers. Private labs such as OpenAI, Anthropic and xAI publish no balance sheets and are the largest payers missing. Samsung is left out because its receivables cannot be split from phones and appliances.
Receivables. The current accounts-receivable line each company reports. Definitions differ: Amazon’s includes vendor and other receivables, GE Vernova’s includes non-trade receivables, Celestica’s is accounts and other receivables, Arm’s leaves out contract assets, and Dell’s leaves out its financing receivables. The totals add every layer, so one end order is counted several times, and customer prepayments are not netted.
Quarters. Each fiscal quarter is assigned to the calendar quarter whose end is nearest, so Nvidia’s October quarter and Micron’s August quarter count as the third quarter. Nine companies whose October quarters are not yet reported are held at their previous balances in the latest quarter. Foreign filers are converted at approximate quarter-end exchange rates, the same rate for receivables and revenue, so the ratios are unaffected.
Ratios. Days sales outstanding is receivables ÷ the quarter’s revenue × the days in the quarter (91.25 for groups). Twelve-month revenue is the sum of four quarters. A company’s tier comes from receivables ÷ its latest quarter’s revenue, rounded to a whole percent.
Growth and slower collection. For each company, on its own last four fiscal quarters: growth = last year’s receivables × the growth in revenue; slower collection = this quarter’s revenue × the change in receivables ÷ revenue. The two sum to the change, and layers are sums of their companies.
The five customers. Nvidia gives each large direct customer’s share of receivables and of revenue but not which is which. Five customers held 70% of $63.1B of receivables. One customer was 16% of the quarter’s $96.2B of revenue and no other reached 10%, so the five were under 16% + 4 × 10% = 56%. Days for the five are then at least 70% ÷ 56% × 59.6 = 74.5, and for the rest at most 30% ÷ 44% × 59.6 = 40.7.
Days payable. Accounts payable ÷ (cost of revenue + the change in inventory in the quarter) × 91. Measured on cost of revenue alone, which is the usual way, the rises are larger, because these companies were building inventory: Dell’s inventory went from $7.2B to $21.3B in a year, and on that basis its days rose 19. The extra days in dollars are purchases × the change in payables ÷ purchases. Payables are owed to every supplier, and the mix of what a company builds moves them too. Taiwan figures are converted at NT$31.9 and NT$30.5 to the dollar.
Capital spending not yet paid. The amount companies disclose as purchases of property and equipment incurred but not yet paid, ÷ the quarter’s cash capital spending × 91.
Estimates. GE Vernova’s receivables before December 2024 are not tagged in its filings and are filled in at 23% of trailing revenue. Two of Dell’s 2023 quarters and two of CoreWeave’s 2024 quarters are interpolated. Quarters before a listing or spin-off (CoreWeave, Nebius, Astera Labs, IREN, Applied Digital, Sandisk) count as zero; Sandisk’s receivables sat inside Western Digital’s. None of these touches the latest year.
The runway. (Level − today’s days) ÷ the rise per quarter, at two paces each: for the suppliers, the average rise over the last four quarters and over the three quarters of 2026; for Nvidia, the latest quarter’s rise and the average of the last two. It is arithmetic on slopes that have lasted two or three quarters.
Not covered. Who Nvidia’s five customers are; nobody discloses it. The October-quarter 10-Q, which will update their share. Receivables sold to banks, which leave the balance sheet. Private companies.